Thermal power plants
Revitalization and modernization of TPP Bitola
- Rehabilitation and modernization of boilers and reducing NOx in TPP Bitola and modernization of the cooling towers.
- Monitoring the financial implementation in accordance with agreements.
- Rehabilitation and modernization of TPP Bitola with reduction of SOx and dust.
Preparation of Project Task for the feasibility study for comparative analysis of modernization and revitalization of REK Bitola - third phase - reduction of SOx and dust, expanded with the influence of all the harmful substances emitted from REK Bitola.
Heating of Bitola, Mogila and Novaci - First phase
- Prepared updated geodetic base and a preliminary report for numeric data. Final report for numeric data will be made after the adoption of project infrastructure.
- On the advice of KfW Bank along with the maker of the basic design made optimization of the project is made taking into account the lower coefficient of connection of households and business objects rather than 0.75 as in the study, a coefficient of 0.5 by which the heat consumption in the first phase was reduced to 100 MW. In the second phase it is foreseen an additional consumption of 100 MW, and in the last phase is planned consumption of 200 MW. Delivered financial analysis to KfW Bank, based on medium heat consumption planned for the first phase.
- Prepared report on assessment of the impact of the project on the environment for transport hot water line REK Bitola - Bitola and approved by the MEPP.
- Made studies for evaluation of the project's impact on the environment and is supplied to the MEPP
- In phase of preparation is a major project and infrastructure project of transport hot water line and distribution network.
- In phase of preparation is the basic design of the primary pumping station Bitola.
- In phase of preparation is the main project of the local pumping stations Novaci and Logovardi.
- According to the contract for consulting services, held meetings with consultants from the Faculty of Mechanical Engineering in Skopje on optimization of the heat and the main equipment.
Modernization of TPP Oslomej
- Selection of vendor and signing a Contract for the feasibility study and implementation of the project "Modernization of TPP Bitola" (The lowest bid submitted by AF Consult - Switzerland)
- Completed activities to collect data and technical documentation.
- Submission of a study on supply of coal.
- Selection and approval of the optimum concept of modernization of TPP Oslomej.
- Delivered notification of intention to implement the project to MEPP.
- Submitted a draft version of the study.
- Presentation of the consultant before the managerial and technical persons of TPP Oslomej (24.09.2014).
- Two presentations of the consultant to the Managing and Supervisory Board of JSC ELEM
- In accordance with the Agreement on consultancy services, meetings were held with consultants from the Faculty of Mechanical Engineering Skopje and FEIT.
- Preparation of observations and comments on the draft version of the study and submitting them to the consultant.
- Development of qualitative and quantitative analysis on the supply with fuel of TPP Oslomej.
Optimization of Energetika
- Selection of vendor and signing a contract for composition of elaborate - study to optimize the plants and the technological process with AF Consult – Switzerland.
- Submission of required data/substrates to the consultant necessary for carrying out the study for optimization of the plants and the technological process.
- Submitted a draft report with basic data.
- Submitted first version of the FS.
- In accordance with the Agreement on consultancy services, meetings were held with consultants from the Faculty of Mechanical Engineering Skopje.