Thermal power plant

Revitalization and modernization of TPP "Bitola"


• Revitalization and modernization of TPP Bitola with reduction of SOx and dust

        • A contract has been signed with a consultant for the preparation of a feasibility study for the reduction of SOx and dust, extended with the influence of all harmful substances emitted by REK "Bitola", which includes a comparative analysis for wet and dry procedure.

Installing Central Heating System in  Bitola, Mogila and Novaci - first phase

• Complete documentation for the main project has been prepared and submitted;
• A project for a hot water infrastructure from REK "Bitola" to Bitola was approved;
• An infrastructure project for a distribution network Bitola was approved;
• A Novaci Infrastructure Project was developed;
• An infrastructure project for Logovardi was developed;
• Projects for infrastructure for tertiary network have been developed
• Authorization for the construction of a new thermal energy facility;
• Elaborates for SEA are approved by MoEPP;
• Appreisal mission by KfW Bank (KfW);
• Project design lots are identified, ie. 4 lots;
• A loan agreement with KfW was signed.

Modernization of TPP "Oslomej"

• Feasibility study for the project "Modernization of TPP Oslomej" by the AF Consult - Switzerland;
• Presentation of the feasibility study on the modernization of TPP "Oslomej" before the Economic Council of the Government of the Republic of Macedonia;
• SEA submitted to MoEPP;
• A contract with the consultant EPLL from Croatia was signed to prepare an analysis about the possibility of operation of the thermal power plant "Oslomej";
• A procedure has been initiated to select a consultant for the revision of a qualitative and quantitative analysis for the supply of fuel for  Oslomej TPP.

Optimization of "Energetika"


• An elaborate study was conducted on the optimization of the plants and the technological process at the subsidiary "Energetika" by AF Consult - Switzerland.
• A project task for the main project for modernization of the distribution facilities in the Energy sector has been prepared;
• Preparation of a project task for a feasibility study for the expansion of the heating network.

TPP Negotino 2 with coal from Negotino mine

• An analysis was conducted for the cost-effectiveness of transporting coal from Negotino coal mine to TPP Bitola and to TPP Oslomej;
• A project task was prepared for the preparation of a pre-feasibility study for a new power plant "Negotino" that would be supplied with coal from Negotino mine.

 

 

 