Structure of AD ELEM

Structure of AD ELEM

Thermoelectric power plants

Thermoelectric power plants have  priority in the power system of Macedonia. They provide 81% of the electricity production in AD ELEM. The largest thermal power plant is REK "Bitola" with its three blocks Bitola 1, 2 and 3, with an average annual net production of 4,200 GWh. Coal is used as a primary fuel for its production in REK "Bitola". REK "Oslomej" is also part of the thermal system in the Republic of Macedonia, with installed block capacity of the 125 MW  and average annual net production of 500 GWh. Coal is also the primary fuel for its production and REK "Oslomej".

 

Thermoelectric power plants

Installed power
MW

Net production
GWh

Commissioned in

Working hours
h

Basic Fuel

Energy value of fuel
kJ/kg

Bitola 1

233

804,7

1982

5275:07:00

Coal

6208

Bitola 2

233

1.110,8

1984

7004:28:00

Coal

6208

Bitola 3

233

1.070,8

1988

6570:17:00

Coal

6208

Oslomej

125

106,5

1980

1657:36:00

Coal

5444

 

 

 

 

 

 

 

TOTAL

824

3.092,7

 

 

 

 

 

 

Hydroelectric power plants

The total installed capacity of the hydro capacities is 553.6 MW, that is, 40% of the total capacities of AD ELEM. There are eight hydropower plants in AD ELEM, out of which two are flowing - "Raven" and "Vrben" and six accumulations - "Vrutok", "Shpilje", "Globocica", "Tikvesh", "Kozjak" and "Sveta Petka". Of the total electricity generation in AD ELEM, about 19% is provided by hydro production, primarily to meet the daily variations in the consumption of electricity and to provide system services for regulation, thus achieving greater flexibility and availability of the Power system

 

Hydroelectric power plants

Number of aggregates

Installed power
MW

Net Production
GWh

Working hours
h

Year of release

Type of power plant

Vrutok

1
2
3
4

41,4
41,4
41,4
41,4

360,19

2559,2
2729,8
2813,8
2500,2

1957/1973

Accumulation

Raven

1
2
3

7
7
7

43,39

3142,7
3155,9
3338,7

1959/1973

Flowing

Vrben

1
2

6,4
6,4

35,31

4312,1
4556,7

1959

Flowing

Shpilje

1
2
3

28
28
28

312,79

4850,0
4865,3
5168,0

1969

Accumulation

Globocica

1
2

21
21

225,53

6256,1
6234,6

1965

Accumulation

Tikvesh

1
2
3
4

28,5
28,5
28
28

303,71

3355,1
3056,5
3252,8
3360,1

1968/1981

Accumulation

Kozjak

1
2

41
41

171,57

1891,9
2660,0

2004

Accumulation

Sveta Petka

1
2

18,2
18,2

75,78

2238,2
2352,6

2012

Accumulation

TOTAL

44

556,8

1528,27

78650,4

 

 

 

Wind power plants

This year, 2015, the "Bogdanci" wind park, located in the area Ranevec near Bogdanci, started regular production of electricity after the successfully passed testing procedures of the equipment, i.e. its characteristics, and receiving the  technical license for operation.

 

Wind power plants

Number of aggregates

Installed power
MW

Net Production
GWh

Year of release

PVE Bogdanci

16

36,8

120,8

2015

 

The turbines are manufactured by Siemens - Denmark and are among the best in their class. The installed power of each is 2.3 MW, the height of the pillar is 80 meters and the diameter of the elise is 93 meters. PVE "Bogdanci" is expected to deliver at least 100 GWh of naturally viable renewable energy annually. At the same time, the windmills will increase the installed capacity of AD ELEM by 36.8 MW. This project will also increase the share of renewable resources in the portfolio of AD ELEM and represents another strong indicator for the company's concern for the environment.

 

Copyright © 2015 A.D ELEM. All rights reserved.