Production results 2015 |
|||
---|---|---|---|
| Planned production |
Production is realized |
Inex |
| GWh |
GWh |
Realized / Planned |
TPP |
3.932,1 |
3.092,7 |
78,7% |
|
|
|
|
Bitola 1 |
1.086,8 |
804,7 |
74,0% |
Bitola 2 |
1.285,9 |
1.110,8 |
86,4% |
Bitola 3 |
1.331,9 |
1.070,8 |
80,4% |
Oslomej |
227,5 |
106,5 |
46,8% |
|
|
|
|
HPP |
1.063,4 |
1.528,3 |
143,7% |
|
|
|
|
Vrutok |
245,2 |
360,2 |
146,9% |
Raven |
29,4 |
43,4 |
147,5% |
Vrben |
33,0 |
35,3 |
107,0% |
Shpilje |
300,3 |
312,8 |
104,2% |
Globochica |
194,3 |
225,5 |
116,1% |
Tikvesh |
130,7 |
303,7 |
232,4% |
Kozjak |
90,0 |
171,6 |
190,7% |
Sveta Petka |
40,6 |
75,8 |
186,8% |
|
|
|
|
TE-TP Energetika |
0,0 |
0,0 |
0,0% |
VPP Bogdanci |
95,5 |
120,8 |
126,4% |
TOTAL |
5.091,0 |
4.741,8 |
93,1% |
In accordance with the production plan for 2015, AD ELEM has realized production of 4,741.8 GWh, which is 93.1% realization of the planned production. Thermoelectric plants have realized 78.7% of the planned production, hydro power plants have produced 43.7% more than planned and wind power plants have realized 26.4% more than the planned production