Results

Production results 2015

 

Planned production

Production is realized

Inex

 

GWh

GWh

Realized / Planned

TPP

3.932,1

3.092,7

78,7%

 

 

 

 

Bitola 1

1.086,8

804,7

74,0%

Bitola 2

1.285,9

1.110,8

86,4%

Bitola 3

1.331,9

1.070,8

80,4%

Oslomej

227,5

106,5

46,8%

 

 

 

 

HPP

1.063,4

1.528,3

143,7%

 

 

 

 

Vrutok

245,2

360,2

146,9%

Raven

29,4

43,4

147,5%

Vrben

33,0

35,3

107,0%

Shpilje

300,3

312,8

104,2%

Globochica

194,3

225,5

116,1%

Tikvesh

130,7

303,7

232,4%

Kozjak

90,0

171,6

190,7%

Sveta Petka

40,6

75,8

186,8%

 

 

 

 

TE-TP Energetika

0,0

0,0

0,0%

VPP Bogdanci

95,5

120,8

126,4%

TOTAL

5.091,0

4.741,8

93,1%

 

In accordance with the production plan for 2015, AD ELEM has realized production of 4,741.8 GWh, which is 93.1% realization of the planned production. Thermoelectric plants have realized 78.7% of the planned production, hydro power plants have produced 43.7% more than planned and wind power plants have realized 26.4% more than the planned production

 