PLANNED PRODUCTION OF ELECTRICITY IN AD ELEM FOR 2015

According to the Production Plan for 2015, AD ELEM planned to produce 5,091.0 GWh, out of which 3,932.1 GWh (77.2%) was planned to be produced by the thermal power plants, 1,063.4 GWh (20.9%) to be produced by hydroelectric Power plants, 0 GWh (0%) to be produced TE-TO Energy and 95.5 GWh (1.9%) to be produced by wind power plants.

Monthly balanced electricity

 

Jan. 15

Feb. 15

Mar. 15

Apr. 15

May. 15

June.15

July. 15

TPP

438,8

394,8

381,8

251,8

250,7

249,2

245,8

HPP

106,7

93,3

97,1

104,2

87,7

73,6

86,8

ТЕ-ТО

0,0

0,0

0,0

0,0

0,0

0,0

0,0

VPP

8,2

8,1

8,2

7,9

7,4

7,9

8,2

TOTAL

553,7

496,1

487,0

363,9

345,8

330,7

340,0

Monthly balanced electricity

 

Aug. 15

Sept. 15

Oct. 15

Nov. 15

Dec. 15

TOTAL

TPP

241,7

237,9

367,1

432,4

440,1

3.932,1

HPP

98,3

79,4

61,0

61,3

114,0

1.063,4

ТЕ-ТО

0,0

0,0

0,0

0,0

0,0

0,0

VPP

8,2

7,9

8,2

7,9

8,2

95,5

TOTAL

348,2

325,3

436,4

501,7

562,3

5.091,0

 

 

 

 

 