Park of wind power plants "Bogdanci"
• LOT 1 - Wind turbines
• The first technical inspection was carried out by an independent inspection body for wind turbines and a report was submitted.
• Preparation of a request to the Technical Inspection (Ministry of Economy) of the first technical inspection has been started by an independent inspection body for wind turbines.
• The first regular annual service of wind turbines was executed.• LOT 2 - Access roads, substation and transmission line
• Technical inspection for TS Bogdanci was carried out by MTV and an approval for the use of the facility has been obtained.
• Technical overhaul of the 110 kV Bogdanci-Valandovo transmission line was executed by the State Commission, and an approval for use was received for the facility.• LOT 3 - Command-control facility and DV field in TS Valandovo
• A technical inspection of the facility has been carried out by the State Commission and an approval has been obtained for the use of the facility.
• Withdrawals from the loan with KfW Bank (KfW).